The 25mm thick heavy metal tube is pushed Using the conclusion closed by a metal shoe. On reaching the required driving resistance, an entire length cage is decreased in for the tube and stuffed with high slump concrete. The tube is then vibrated out leaving a shaft of concrete.Link a hopper to the highest of tremie pipe. After that, shut the joint